Reading: Top 10 Best Contract Procedure │ Method of Bidding
Notification Show More
Latest News
Latest Cement Prices in Nepal
The Latest Cement Prices in Nepal Market
Construction Materials
Floor Tiles Calculation Formula
Floor Tiles Calculation Formula | How Many Tiles Do You Need 144 sq ft tile flooring?
Construction
Autodesk AutoCAD 2026 Product Key
Autodesk AutoCAD 2026 Product Key, Serial Numbers, and Download Information
Engineering Design
Polycarbonate Sheet Vs Toughened Glass Roofing
Polycarbonate Sheet vs Toughened Glass Roofing for Terraces: Which is Best in 2025?
Construction Materials
Honeycomb in RCC Structure
Honeycomb in RCC Structure: Causes, Effects, and Permanent Solutions You Must Know
Construction
Aa
Tech Me EngineerTech Me Engineer
Aa
Search
  • Engineering
    • Engineering Surveying
    • Construction
    • Construction Materials
  • Designing
    • Engineering Design
    • Graphics Design
  • Social Media
  • Technology
    • Computer
    • Apps
  • Earn Money
  • Tools
    • Brick Calculator
    • Construction Material Calculator
    • Tank Volume Calculator
    • Plaster Quantity Calculator
    • Reinforcement Bar Calculator
Follow US
Tech Me Engineer > Construction > Top 10 Best Contract Procedure │ Method of Bidding
Construction

Top 10 Best Contract Procedure │ Method of Bidding

Ramesh Pradhan
Last updated: 2025/02/08 at 8:09 AM
Ramesh Pradhan
Share
10 Min Read
contract
SHARE

Hey guys, welcome to my website to the next blog. Today we will discuss the Top 10 Best Contract Procedure or method of bedding.  Bedding is the most important part of the engineering and Construction sector. So that we need more information about bidding.   

Table of content
What is a Contract?Table of Contract Procurement MethodTop 10 Contract Process DescriptionNational competitive bidding (NCB)International competitive bidding (ICB)Sealed quotationDirect ProcurementWorks through user committee Works may be done by force accountLump sum-rate methodCatalog ShoppingLimited tenderingBuyback method

Do you know what the process is followed on it?  In this post, we will discuss in detail the contractor bidding in the situation of Nepal.  Many types of procedures are followed.

If you are an engineer, Builder, or contractor this procedure is very important for you. so let’s get started:

What is a Contract?

It is an agreement between two or more two parties to do or not to do something which can be enforceable by law.  It may not have a legal obligation in the contract.  All the contracts are agreements but all agreements are not contracts.  So we need to know all the procedures of the bidding. 

Contract Procedure

Contract=  agreement + Legality.

Now we will discuss the method of procurement for the method of work Execution. Falling off the table of procurement in bidding. I included 10 procurements or methods of bidding in the condition of Nepal. let’s see the table below:

Table of Contract Procurement Method

SNProcurement MethodContract SizeNotice Date
1International Competitive Bidding (ICB)National Competitive Bidding (NCB)45 Days
2More than 20 lakh rupeesUp to 20 lakh rupees30 Days
3Sealed QuotationUp to 5 lakh Rupees15 Days
4Direct ProcurementUp to 1 lakh Rupees
5Force AccountProcurement under Special Circumstances
6Users committeeUp to 1 crore Rupees works of simple nature
7Procurement under Special CircumstancesEmergency / Special Circumstance
8Lump-sum rate methodUp to 2 crore Rupees30 Days
9Catalog Shopping7 to 15 days
10Limited Tendering15 days
11Buy Back Method

Now let’s discuss the different Methods of This Process In Bidding. These methods are used all over the world. This is the basic and most important Method used in Bidding. The contract is also one of the technical parts of engineering.

So I covered this topic in my post. I have discussed the Name of the individual method of contract, Working size, and their Notice date. Different types of projects have different Dates and budgets. So guys without wasting time come to the point.

Top 10 Contract Process Description

National competitive bidding (NCB)

This is the local competitive bidding. In this process, All Eligible bidders are invited to participate in the bidding.  for MCB Tender notice is to be published in an international newspaper A period of at least 30 days. this method is basically to notice the person who wants to apply for the tender.  It is the initial stage of the bidding.

This type of bedding has a first option for more than 20 lakhs.  This is the size of national competitive bidding.  now next.

International competitive bidding (ICB)

The amount of work is big and national domestic contractors cannot perform the job eligible by the hour in bi from all over the world.  This type of bid is published all over the world and then different types of companies and people can apply for this bid. The international competitive bidding cost of some or more than one professor and consultant service is more than 10 Crore rupees. This is the size of international competitive bidding.  keep in mind this point. Such a type of bid is known as ICB.

In this process, tender notice shall be published in the international newspaper in the English language providing A period of at least 45 days. 

The English language is the international language so it is necessary to publish in the English language of the tender all over the world. 

Which type of notice is published for 45 days only.  In this period of time, the contractors are bidding on the project.  invitation to an international level it shall be invited in any of the following conditions.

  • where the goods for construction work are not available at a competitive price from more than one construction entrepreneur or supplier within Nepal.
  •  Where  No bid was submitted in the National level bid.
  •  Where under an agreement with the donner party.
  • Where the public entry has certified That the goods for construction work being of a complex and special nature have to be procured through an international level bid.

Sealed quotation

This is the heart method of bidding.  The cost of some work goods and other services valuing  Up to 20 lakh rupees May be procured by Inviting sealed quotations.

For inviting sealed quotations, tender notice shall be published in the national or local newspaper for at least 15 days.

Direct Procurement

This is the first method of bidding in which the construction of works and other services valuing up to 5 lakh rupees may be directly procured. The beading size of direct procured is up to 5 lakh.

Provided under this section cannot be directly procured from the same individual, firm,  company, or organization more than one time in a fiscal year.  but Nepali products valued up to 15 lakh rupees may be directly procured.

Works through user committee

This is also a very important type of bidding process at the international level.  In this method, a cost of estimated up to 1 crore rupees may be carried out and obtained from the user’s community or beneficiary community. The maximum size of this method of bidding is up to 1 crore.

 Works may be done by force account

This is also the most usable method of the Bidding process.  In this process, the bear and maintenance of ordinary nature regular petty for sanitation may be done by force account.

In this process, the construction work may not exceed one lakh rupees to be cashed out through negotiations or be awarded on a wage basis making available necessary construction materials. 

Lump sum-rate method

In this method, a single long surprise for the procurement of any goods and services is agreed upon before the work begins.

This method of construction size is up to 2 crores for the 30 days time period. Generally, the tender is submitted with the details of how and on what basis the work is going to be performed. 

This is the most important and useful method of its process. The maximum size of the lump sum rate method is up to 2  crore.

Catalog Shopping

In this method, the procurement Is made at the rate prescribed by the manufacturer or authorized dealer.

The manufacturing company prescribes the sale price of the product based on specialty quality and benefits and publishes the sale price on its website. 

After the publication of such a Sale price, the competitive procurement is made on the price prescribed by other manufacturing Companies of similar nature.

This method of contract process notice date is 7 to 15 days.

Limited tendering

This method allows Limited bidders for the procurement. If there is a limited service provider for the procurement of any service the competition for the procurement is made only between and among the  Limited bidders.  this method of contract process period of notice date of 15 days.

Buyback method

The new procurement is made by returning the machinery and equipment to the related Manufacturer or importer if the machinery and equipment are to be of no use after a certain period of time. Unlimited time for the contract process. 

In this all above the process for bidding.  I hope this article is very helpful to you. If you like please share this post with your friends and others who want to know about its process.  If you have any doubts or queries about the process from these articles please comment down on the comment section. Visit the blog for more knowledge articles.

What do you think?
Love0
Sad0
Happy0
Angry0
By Ramesh Pradhan
Follow:
Hi, My Name is Ramesh Pradhan. I am qualified as a Civil engineer From Nepal. I am Working in the Reputed Building Construction Company in Nepal. I am also the CEO and Co-Founder of the "Tech Me Engineer" Website. I am Working on the Construction information, AutoCAD, Autodesk, Estimation, Irrigation, Computer, and Related Field on this Website. "THANKS to VISIT"
Previous Article Construction Estimating Construction Estimating I Top 5 Best Estimate Accuracy Level.
Next Article Calculate Cement for Tile Calculate Cement for Tile 200 sq ft Floor Area: A Complete Guide for Builders and DIYers
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

You Might Also Like

Floor Tiles Calculation Formula
Construction

Floor Tiles Calculation Formula | How Many Tiles Do You Need 144 sq ft tile flooring?

September 19, 2025
Honeycomb in RCC Structure
Construction

Honeycomb in RCC Structure: Causes, Effects, and Permanent Solutions You Must Know

October 7, 2025
build a strong house in Nepal
Construction

🏡 How to Build a Strong House in Nepal: Why Most Homes Fail and What You Should Do Instead [5 Reason]

July 2, 2025
cost of terrace waterproofing treatment
Construction

Cost of Terrace Waterproofing treatment {150k to 250k}

September 18, 2025

© 2025

Tech me Engineer

All rights reserved

  • About Us
  • Terms And Conditions
  • Privacy Policy
  • Disclaimer
  • Contact Us
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?